1.  For all Other Documents  (Under Section 6)

 

Specifications Item Description Date of Revision Action/ Work
1 Civil Engineering Construciton June 2013  Download
2 Pipe Laying June 2013  Download
3 Service Connection June 2013  Download
4 Trench Excavation, Backfilling & Road Reinstatement for pipe laying June 2013  Download
5 Trenechlesss Pipe Installation June 2013  Download
6 Serveying Works June 2013  Download
7 Timber Works June 2013  Download
8 Pipeline Maker Tape May 2016  Download
9 Mastic Tape October 2016  Download
10 Pressure Testing of DI CI and PVC Pipe October 2016  Download
Specifications Item Description Date of Revision Action/ Pipes, Valves & Accessories
1 DI Pipes and Fittings for Water Supply Application June 2013  Download
2 DI Pipes & Fittings and Specials for Sewerage Applications June 2013  Download
3 PVC Pipes and Fittings Jan. 2016  Download
4 PE Pipes and Fittings for Water Supply Application June 2013  Download
5 PE Pipes and Fittings for Sewerage Application June 2013  Download
6 Steel Pipes and Fittings June 2013
7 Galvanized Pipes & Fittings June 2013  Download
8 Valve, Hydrants, Surface Boxes & Manhole Covers June 2013  Download
9 Mechanical Couplings, Repair Clamps and Flange Adaptors May 2017  Download
10 Clamp Saddles June 2013  Download
11 Ball Valves June 2013  Download
12 Stop Valves June 2013  Download
13 Repair Clamps June 2013  Download
14 Waltman Type Bulk Water Meters June 2013  Download
15 Flow Meters and Waste Meters June 2013  Download
16 Penstocks & Headstocks June 2013  Download
17 Supply & Installation of Surge Protection Devices June 2013  Download
18 PVC/ ABS/ Stainless Steel/ Bronze/ DI/ CI Vlaves, Shear gates, Slide gates and Manhole Covers & Frames of Sewerage Application June 2013  Download
19 PVC Pipes for Sewerage March 2016  
20 PP Clamp Saddles June 2013  Download
21 Surge vessles & Air compressor June 2013  Download
Specifications Item Description Date of Revision Action/ Water Pumps
1 Motor Driven Self lubricated vertical Turbine pumping sets and Accessories June 2013  Download
2 Horizontal shaft driven double suction pumping sets and accessories June 2013  Download
3 End Suction vertical delivery Back pull-out centrifugal Pumping sets and Accessories June 2013  Download
4 Vertical Shaff driven double suction centrifugal pumping sets and Accossories June 2013  Download
5 Vertically/ Horizontaly mounted in line booster pumping sets & accessories June 2013  Download
6 Bore hole type submersible pumping sets and Accessories June 2013  Download
Specifications Item Description Date of Revision Action/ Sewer Pumps
1 Supply & Installation of Auto Coupling type wet well electrically driven submersible pumps and accessories (Wet well below 30 kw) June 2013  Download
2 Wet well Above 30 kw June 2013  Download
3 Dry well below 30 kw June 2013  Download
4 Dry well Above 30 kw June 2013  Download
Specifications Item Description Date of Revision Action/ Air Condition
1 Air Conditioner - Window type June 2013  Download
2 Air Conditioner - Split & Casse tte Type June 2013  Download
3 Lighting protection system June 2013  Download
Specifications Item Description Date of Revision Action/ Chemicals for Water
1 Aluminium Sulphate July 2018  Download
2 Bleaching Power June 2013  Download
3 Hydrated Lime July 2018  Download
4 Poly Aluminium Chloride June 2013  Download
5 Cationic Polyacrlamides June 2013  Download
6 Potassium Permanganate March 2018  Download
Specifications Item Description Date of Revision Action/ Office Equipments & Miscellaneous
1 Computer June 2013  Download
2 Photo Copier June 2013  Download
3 Hiring Vehicle (English) June 2013  Download
4 Hiring of Vehicle(Sinhala) June 2017  Download
5 Janitorial Work June 2013  Download
6 Water Bowsers July 2014  Download
7 Pontoon Intake January 2016  Download
Specifications Item Description Date of Revision Action/ Water Meter & Gun Metal Ferrule
1 Water Meter & Spare Parts  June 2012  Download
2 Gun Metal Ferrule  December 2016  Download
Specifications                      Item Description                                               Date of Revision               Action/ Chlorinators          
 1  Gas Chlorinators and Accessories  June 2013  Download
 2  Lime and Alum/ Poly Aluminium chloride  dosing packages  June 2013  Download
 3  Hosting equipment and accessories  June 2013  Download
 4  Water sampling collection system  June 2013  Download
 5  Laboratory equipment  June 2013  Download

 

 

 

2.  For FIDIC Plant & Design (Under Section 8)

Specifications Item Description Date of Revision Action/ Work
1 Civil Engineering Construciton June 2013  
2 Pipe Laying June 2013  
3 Service Connection June 2013  
4 Trench Excavation, Backfilling & Road Reinstatement for pipe laying June 2013  
5 Trenechlesss Pipe Installation June 2013  
6 Serveying Works June 2013  
7 Timber Works June 2013  
8 Pipeline Maker Tape May 2016  
9 Mastic Tape October 2016  
10 Pressure Testing of DI CI and PVC Pipe October 2016  
Specifications Item Description Date of Revision Action/ Pipes, Valves & Accessories
1 DI Pipes and Fittings for Water Supply Application June 2013  
2 DI Pipes & Fittings and Specials for Sewerage Applications June 2013  
3 PVC Pipes and Fittings Jan. 2016  
4 PE Pipes and Fittings for Water Supply Application June 2013  
5 PE Pipes and Fittings for Sewerage Application June 2013  
6 Steel Pipes and Fittings June 2013  
7 Galvanized Pipes & Fittings June 2013  
8 Valve, Hydrants, Surface Boxes & Manhole Covers June 2013  
9 Mechanical Couplings, Repair Clamps and Flange Adaptors May 2017  
10 Clamp Saddles June 2013  
11 Ball Valves June 2013  
12 Stop Valves June 2013  
13 Repair Clamps June 2013  
14 Waltman Type Bulk Water Meters June 2013  
15 Flow Meters and Waste Meters June 2013  
16 Penstocks & Headstocks June 2013  
17 Supply & Installation of Surge Protection Devices June 2013  
18 PVC/ ABS/ Stainless Steel/ Bronze/ DI/ CI Vlaves, Shear gates, Slide gates and Manhole Covers & Frames of Sewerage Application June 2013  
19 PVC Pipes for Sewerage March 2016  
20 PP Clamp Saddles June 2013  
21 Surge vessles & Air compressor June 2013  
Specifications Item Description Date of Revision Action/ Water Pumps
1 Motor Driven Self lubricated vertical Turbine pumping sets and Accessories June 2013  
2 Horizontal shaft driven double suction pumping sets and accessories June 2013  
3 End Suction vertical delivery Back pull-out centrifugal Pumping sets and Accessories June 2013  
4 Vertical Shaff driven double suction centrifugal pumping sets and Accossories June 2013  
5 Vertically/ Horizontaly mounted in line booster pumping sets & accessories June 2013  
6 Bore hole type submersible pumping sets and Accessories June 2013  
Specifications Item Description Date of Revision Action/ Sewer Pumps
1 Supply & Installation of Auto Coupling type wet well electrically driven submersible pumps and accessories (Wet well below 30 kw) June 2013  
2 Wet well Above 30 kw June 2013  
3 Dry well below 30 kw June 2013  
4 Dry well Above 30 kw June 2013  
Specifications Item Description Date of Revision Action/ Air Condition
1 Air Conditioner - Window type June 2013  
2 Air Conditioner - Split & Casse tte Type June 2013  
3 Lighting protection system June 2013  
Specifications Item Description Date of Revision Action/ Chemicals for Water
1 Aluminium Sulphate August 2017  
2 Bleaching Power June 2013  
3 Hydrated Lime June 2013  
4 Poly Aluminium Chloride June 2013  
5 Cationic Polyacrlamides June 2013  
6 Potassium Permanganate March 2018  
Specifications Item Description Date of Revision Action/ Office Equipments & Miscellaneous
1 Computer June 2013  
2 Photo Copier June 2013  
3 Hiring Vehicle (English) June 2013  
4 Hiring of Vehicle(Sinhala) June 2017  
5 Specification for Janitorial Work June 2013  
6 Water Bowsers July 2014  
7 Pontoon Intake January 2016  
Specifications Item Description Date of Revision Action/ Water Meter & Gun Metal Ferrule
1 Water Meter  June 2012  
2 Gun Metal Ferrule  December 2016  
Specifications                      Item Description                                               Date of Revision               Action/ Chlorinators          
 1  Gas Chlorinators and Accessories  June 2013  Download
 2  Lime and Alum/ Poly Aluminium chloride  dosing packages  June 2013  Download
 3  Hosting equipment and accessories  June 2013  Download
 4  Water sampling collection system  June 2013  Download
 5  Laboratory equipment  June 2013  Download