Environmental Assessment and Review Framework

SRI: Greater Colombo Water and Wastewater Management Improvement Investment Program - June 2013
Prepared by the National Water Supply and Drainage Board and Colombo Municipal Council for the Asian Development Bank.

Resettlement Plan

SRI: Greater Colombo Water and Wastewater Management Improvement Investment Program (Project 2 Component 1: Nonrevenue Water Reduction in Colombo City) - June 2013
Prepared by the National Water Supply and Drainage Board and Colombo Municipal Council for the Asian Development Bank.

Greater Colombo Water and Wastewater Management Improvement Program (Project 1)

Effectiveness of Rain Water Harvesting (RWH) Systems as a Domestic Water Supply Option by Tanuja Ariyananda and M.M.M. Aheeyer of Lanka Rainwater Harvesting Forum Colombo - October 2011

Section I & II - Invitation for Submission of EOI [PDF - 248 KB]
Section III [PDF - 67.8 KB]
Section IV - Submission Format [PDF - 56.1 KB]
Section V - NWSDB Project Cost Estimates [PDF - 84.6 KB]
Section VI - Feasibility Reports [PDF - 38.3 MB]
DS Divisions-wise Coverage and Level of Service Details (2008) [PDF - 34.1 KB] [ZIP - 30.8 KB]
DS Divisions-wise Coverage and Level of Service Details (2009) [PDF - 33.2 KB] [ZIP - 25.7 KB]
DS Divisions-wise Coverage and Level of Service Details (2010) [PDF - 93.9 KB] [ZIP - 79.3 KB]
DS Divisions-wise Coverage and Level of Service Details (2011) [PDF - 96.8 KB] [ZIP - 84.6 KB]
DS Divisions-wise Coverage and Level of Service Details (2012) [PDF - 132 KB] [ZIP - 120 KB]
DS Divisions-wise Coverage and Level of Service Details (2013) [PDF - 417 KB] [ZIP - 302 KB]

View our Drinking Water Quality Status here

Water Conservation Poster Collection
[Download File - ZIP - 3.06 KB]

Write comment (0 Comments)

Regional Support Centre (Northern) for more Click here.....

In August 2009 the North RSC functions were completely separated from the other RSCs and a DGM was appointed. An AGM was also put in place to provide support in running the RSC.  O&M activities come under Jaffna Region and are managed by a Regional Manager.  The main RSC functions are to provide necessary support to the Regional Office in the day to day O&M activities and to provide help and guidance in the existing scheme rehabilitation and augmentation work.

The O&M manager reports to the AGM. All RSC functions are monitored by the Additional General Manager for North & Central. The RSC is providing services to the Regional Offices within their capacity.  Any additional help, if necessary, is obtained from H/O through the respective Additional General Manager.

As this is a newly setup unit and due to the extraordinary situation that has prevailed for nearly three decades, the coverage of NWSDB in the North is limited. There are some medium scale schemes operational in Vavuniya and Mannar district. All other schemes in North RSC are very small scale water schemes.

The NWSDB is now taking steps to establish the North RSC as an independent unit, providing it with support in order to be able to widen and improve the services to the consumers in the North.

northern map
Please click on map to enlarge it
Statistics of the Area
Total Area 8,884.0 km2
Population (2015)* 1,236,850
Population Density (2014) 139.22/km2
Estimated mid year Population by the Department of Census and Statistics - Sri Lanka

Click on below links to View or Download the original map published by the Survey Department of the Government of Sri Lanka.

 

As at end of No. of Connection
2006 4,439
2007 5,083
2008 5,435
2009 5,729
2013 8,762
2014 11,972
2015 14,779
2016 April 15,332

The quality of water being supplied is tested regularly. Click here for a summary of test results taken island-wide.

Schemes which are presently in operation

Region District Scheme

Total no. of connections as end of
30th April 2016

Average Monthly Production
(m3/ month)
Vavuniya  Vavuniya Vavuniya 1,794 25,710.00
Mannar Adampan 550 8,360.00
  Erukkilampiddi 457 188,430
  Thirukatheeswaram 101
  Mannar 5475
  Vankalai 1050
  Murunkan  168
  Vedaththalthivu 693 9,327.00
  Vellankulam  554 13,100.00
Jaffna Jaffna Kayts 400 3,090.00
  Vaddukoddai 58 420.00
  Watharawathai 455 7,500.00
  Chunnakam 128 900.00
  Velvettithurai 282 5,850.00
  Karainagar 88 360.00
  Araly 275 1680.00
  Karaveddy 854 12,210.00
  Velanai 71 2,760.00
  Nainativu 9 120.00
  Analativu 6 30.00
  Mandaithivu 68 480.00
  Kaithady 161 1200.00
  Vempirai 45 390.00
  PointPedro 816 8,220.00
Mullaitivu Pandiyankulam 130 2,370.00
  Mallavi 264 3,540.00
  Oddusuddan 230 4,200.00
Vavuniya Nedunkerny 150 2,700.00
Killinochchi Kilinochchi - -
Total 15,332 302,947.00
Postal Address : Regional Support Centre (Northern)
National Water Supply & Drainage Board
Jaffna Road, Vavuniya
Telephone
: +94 24 2225719
Fax
: +94 24 2225088/2227341/2225720
Name & Designation Telephone Fax Mobile E-mail
Mr.A.M.A.Rafeek
Deputy General Manager

+94242225719
0777264857

+94242225088  +94 77 385 6730  This email address is being protected from spambots. You need JavaScript enabled to view it.">dThis email address is being protected from spambots. You need JavaScript enabled to view it.
Mr. K.Vasudevan
Assistant General Manager (Northen)
+94 24 2225720
0777755135
+94 24 2227341 +94 77 244 2075 This email address is being protected from spambots. You need JavaScript enabled to view it.">gThis email address is being protected from spambots. You need JavaScript enabled to view it.

Managers (Operational & Maintenance)

Name & Designation Telephone Fax Mobile
Mr.E.Jegatheesan
Regional Manager (Jaffna)
+94 21 2217094 +94 21 2227965 +94 71 4861540
Mr. N.Elanchelian
District Engineer (Jaffna)
+94 21 2223742 +94 21 2227965 +94 779357135
Mr.N.Navaruban
District Engineer (Killinochchi/Mullaitivu)
+94 21 2283981 +94 21 2283981 +94 77 7862354
Mr. J.Vijayabalan
Regional Manager (Vavuniya)
+94 24 2222169 +94 24 2225088 +94 77 7811246
Mr. J.Vijayabalan
District Engineer (Vavuniya)
+94 24 2222169 +94 24 3248011 +94 77 937 2769
Mr. G.Nimalan
District Engineer (Mannar)
+94 23 2222124 +94 23 2222851 +94 77 2662433

 

Development Section

Name & Designation Telephone Fax Mobile
Mr. E.Jesuthason
Chief Engineer(Planning & Co-ordination)
+94 24 222 5720 +94 24 2225720 +94 77 7706695

Mr.E.Selvakumar
Chief Enginner(Planning & Design)

+94 24 2225720 +94 24 2225720 +94 772984177

Mr.N.Athmarajah
Chief Engineer (Planning & Construction)

+94 24 2225720 +94 24 2225720 +94 71 4910697
Mr.N.Aravinthan
Chief Engineer(Mechanical  & Electrical)
+94 24 2225720 +94 24 2225720 +94 752361299

  

Service Standard Indicators

Service Indicators  RSC (Northern) 2016
Regional Average
Water Coverage (%) Pipe System maintained by NWSDB 6.15%
Per Capita Consumption (l/c/d) 99.76
Water Availability (hours) 14.00
Water Quality - Bacteriological Quality Compliance 100% 
Water Quality - Bacteriological Testing Compliance 100% 
Sewerage Coverage (%) -

Operational Indicators

Operational Indicators RSC (Northern) 2016
Regional Average
Non-Revenue Water (%) 29.66%
Non-Revenue Water - m3/conn/day 0.21
Defective Meters per '1000 connections 4.53
Total Staff/ 1000 connection 18.47
Operational Staff/ 1000 connection 16.5
Estimated Bills/ 1000 connections 36.36

Performance in Customer Service

Customer Service Indicators RSC (Northern) 2016
Regional Average
Response to requests for new service connections (%) 79.75%
Customer Complaints Volume (Complaints/ 1000 connection) 6.57
Customer Complaints Resolution 100%

Key Performance Indicators (KPIs)

Financial KPIs RSC (Northern) 2016
Regional Average
Collection Ratio (%) 89.50%
Accounts Receivable Period (months) 4.39
Collectable Accounts Receivable Period (months) 2.49
Operating Ratio 4.10
Production Cost (LKR/ m3 Produced) 31.34
Average Tariff (LKR/ m3 Sold) 45.13
Stock Efficiency (LKR/ connection) 10,021.88

 

Write comment (0 Comments)

A Deputy General Manager (DGM) heads the Eastern RSC with the support of an Assistant General Manager (AGM). Operations and Maintenance (O&M) activities are divided into four regions namely Trincomalee, Ampara, Batticaloa and Akkaraipattu Region and are managed by four different regional managers. Mainly the RSC functions are to provide necessary support to the four regional offices in the day to day O&M activities and to provide help and guidance in the existing scheme rehabilitation and augmentation work.

Trincomalee O&M Manager directly report to DGM and all other O&M Managers report to the DGM through the AGM and all RSC functions are monitored by the Additional General Manager. The RSC provides services to all regional offices within their capacity, any additional help is obtained from the head office (HO) through the Additional General Manager.

Inspite of having functioned for a long time, the RSC still lacks capacity specially in some technical services, such as planning and design activities, electromechanical works etc. This is primarily due to lack of technical staff and other resources. The main reasons for the shortage of staff are the geographical location and the lack of quarters facilities which has made it very difficult for the RSC to appoint the required skilled personnel as only a few are willing to come and work in the area.


Please click on map to enlarge it
Statistics of the Area
Total Area 9,996.0 km2
Population (2012) 1,551,381
Population Density (2012) 160.0/km2
* Population by the Department of Census and Statistics - Sri Lanka

Click on below links to View or Download the original map published by the Survey Department of the Government of Sri Lanka.

The quality of water being supplied is tested regularly. Click here for a summary of test results taken island-wide

Schemes which are presently in operation

Region Scheme Total no. of connections
as end of 31th December 2014
Average Monthly
Production
(m3/ month)
Ampara Region Damana 351 55746
Uhana 1596
Hingurana 938
Mahaoya 81 2940
Ampara 7254 260389
Padiyathalawa 507 13265
Inginiyagala 356 8555
Dehiattakandiya 2666 45019
Sammanthurai 9932 164988 
Valathapittiya 707
Akkaraipattu Region Ninthavur 4364 298882
Karaithivu 3707
Sainthamaruthu 6219
Kalmunai 9073
Maruthamunai 4967
Irakkamam 2668 326944
Akkaraipattu 10559
Addalaichenai 3481
Oluvil & Palamunai 3236
Pottuvil 2687 54516
Thirukkovil 933 9899
Batticaloa Region Chenkalady 24 235
Batticaloa 2940 76636
Eravur 934 5674
Irudayapuram 868 11154
Kattankudy 4695 29903
Kallar 3704 26211
Kaluwanchikudy 309 3600
Kallady 717 9474
Arayampathi 852 8644
Vavunathivu 667 4948
Trincomalee Region Seruwila 102 856113
Town 10286
Palaiyoothu 6034
Kantale 6024
Thampalagamam 4077
Kinniya 6515

Andakulam

3635
Total 128665 2277327

Ongoing Projects

Small and Medium Water Supply Projects

Project Name  No. of Beneficiaries  Total Cost Estimate
(Rs. Million)
 
Duration
From To
Kantale (Agbopura) Water Supply 8,000 275.0 Jan
1999
Dec
2014
Thampalakamam Water Supply 28,000 95.2 Jan
1999
Dec 2012
Serunuwara Water Supply 2,500 110.1 Jan
2001
Dec
2016
Wanele Water Supply 14,000 808.5 Dec 2012 Dec
2015

Large Scale Water Supply and Sanitation Projects

Project Name (Donor) No. of Beneficiaries  Total Cost Estimate
(Rs. Million)
 
Duration
From To
Trincomalee District
Greater Trincomalee
Integrated Water
Supply Scheme
(5 DS Divisions)
333,000 (Population)
65,000 (Connections)
EURO 20.35
LKR 1000
Jan
2005
Jan
2013
Mutur WSS ADB funded
Secondary Towns and
Rural Community
Based Water Supply and
Sanitation Project
(35 GN Divisions)
52,000 (Population)
10,000 (Connections)
2,885 Jan
2004
Dec
2013
Eachalampathu WSS
Serunuwara WSS
26,000 (Population)
7,000 (Connections)
1,074 Jan
2011
Jun
2014
Ampara District
JICA WSS Eastern Province
Water Supply Development
Projects (EPWSDP) - Ampara
290,000 (Population)
58,000 (Connections)
LKR 6,526 Foreign Fund
LKR 5,266 GoSL LKR 1,260
Jul
2010
Dec
2013
Ectad - (Phase - 111) WSS
Intergrated Water Supply
Scheme for the Unserved Areas of Ampara District
200,000 (Population)
47,000 (Connections)
12,175 Nov
2011
Dec
2015

Please Click here to view / download full contact list for Regional Support Centre (Eastern)

Postal Address : Regional Support Centre (Eastern)
National Water Supply & Drainage Board
No: 48A/1, Kandy Road,
Trincomalee
Telephone : +94 26 2222028
Fax : +94 26 2225225

 

Name & Designation Mobile E-mail
Eng. Navaratnarajah Sudesan
Deputy General Manager
+94 77 2442049 This email address is being protected from spambots. You need JavaScript enabled to view it.
Eng. Konamalai Vassudevan
Assistant General Manager (East)
+94 777755135


This email address is being protected from spambots. You need JavaScript enabled to view it.

This email address is being protected from spambots. You need JavaScript enabled to view it.

Eng. K. Vinothan
Assistant General Manager (ES)

+94773179445   This email address is being protected from spambots. You need JavaScript enabled to view it.
Eng. D.A.Pragash
Assistant General Manager (Operation)
+94777937754   This email address is being protected from spambots. You need JavaScript enabled to view it.

Managers (Operational & Maintenance)

Name & Designation Telephone Fax Mobile E-mail

Eng. S.Jayanthan
(Trincomalee)
Responsibility Areas:

Trincomalee Town, Palaiyoothu,

Andakulam, Kinniya, Thampalagamam, 

Kanthale and Seruvila and Nillaveli and Muthur

Pullmoddai & Eachilampattu

+94 262225383 +94 26 2225383 +94 77 7755133  This email address is being protected from spambots. You need JavaScript enabled to view it.

Eng. W.A.K.J. Perera 
(Ampara)
Responsibility Areas:

Uhana, Inginiyagala, Damana,

Hingurana, Ampara Dehiyadakkandiya,

Padiyathalawa,Mahaoya,

Sammanthurai and Valathapittiya

+94 632222125 +94 63 2222024 +94 773986267  This email address is being protected from spambots. You need JavaScript enabled to view it.

Eng.U.K.M.Musajith
(Akkaraipattu)
Responsibility Areas:

Irakkamam, Akkaraipattu,

Addalachchenai, Palmunia & Oluvil,

Ninthavur,Karaithivu,Sainthamaruthu,

Kalmunai, Maruthamunai,

Thirukkovil and Pottuvil

+94 672277339 +94 67 2279324 +94 77 2385372  This email address is being protected from spambots. You need JavaScript enabled to view it.

Eng. M.Kumarathas
(Batticaloa)
Responsibility Areas:

 Chenkalady,Batticoloa,Eravur,

Irudayapuram, Kattankudy,Kallar,

Kaluwanchikudy, Kallady,

Arayampathi,Vavunathevu

+94 652227476 +94 65 2050600  +94 77 3179448  This email address is being protected from spambots. You need JavaScript enabled to view it.

Service Standard Indicators

Service Indicators 2014
Regional Average
Water Coverage (%) Pipe System maintained by NWSDB 41.0%
Per Capita Consumption (l/c/d) 79.7
Water Availability (hours) 19.0
Water Quality - Bacteriological Quality Compliance 100.0%
Water Quality - Bacteriological Testing Compliance 100.0%
Water Quality - All Samples Compliance 95.0%
Sewerage Coverage (%) -

Operational Indicators

Operational Indicators 2014
Regional Average
Non-Revenue Water (%) 20.0%
Non-Revenue Water - m3/conn/day 0.12
Defective Meters per '000 connections 15
Total Staff/ 1000 connection 6.6
Operational Staff/ 1000 connection 5.9
Estimated Bills/ 1000 connections 18.9

Performance in Customer Service

Customer Service Indicators 2014
Regional Average
Response to requests for new service connections (%) 64.8%
Customer Complaints Volume (Complaints/ 1000 connection) 18.6
Customer Complaints Resolution 97.0%

Key Performance Indicators (KPIs)

Financial KPIs 2014
Regional Average
Collection Ratio (%) 92.4%
Accounts Receivable Period (months) 4.2
Collectable Accounts Receivable Period (months) 2.6
Operating Ratio 1.32
Production Cost (LKR/ m3 Produced) 36.5
Average Tariff (LKR/ m3 Sold) 15.6
Stock Efficiency (LKR/ connection) 2,528
Write comment (0 Comments)

Uva province comprises of two districts namely Badulla and Moneragala. Under the supervision of Deputy Genereal Manager Regional Support Centre (DGM-RSC), Regional Office, Bandarawela and Regional Office, Moneragala are functioning with 20 water supply schemes and 11 water supply schemes respectively.

uva map
Please click on map to enlarge it
Statistics of the Area
Total Area 8,488.0 km2
Population (2002) 1,259,900
Population Density (2012) 148.4/km2
* Population by the Department of Census and Statistics - Sri Lanka

Click on below links to View or Download the original map published by the Survey Department of the Government of Sri Lanka.

The quality of water being supplied is tested regularly. Click here for a summary of test results taken island-wide.

Schemes which are presently in operation

1.Ongoing Projects

Small and Medium Water Supply Projects
Project Name Total Cost Estimate
(Rs. Million)
No. of Beneficiaries Started Date Expected Date of Completion
 

Ohiya Transmission

 

264.7  10,000 Feb-1999 Commissioned on 25.02.2013 

Ohiya Distribution improvement

Mar-2013 Nov-2014
Monaragala Water Supply - Stage II 154.8  10,000 Jun-1999 Nov-2014
Badalkumbura Water Supply 124.4  22,000 Oct-1999 Apr 2013
Ambagasduwa Water Supply - Stage I 382.0  17,750 Jun-1999 Nov 2013
Jun-2013  Nov-2014
Wellawaya Water Supply - Stage I 250.0   6000 Jan-2007 Commissioned on 25.07.2012
Wellawaya Water Supply - Stage II Aug-2012  Nov-2014

 Urgent improvements to Bandarawela and Diyathalawa Water Supply Schemes (6month crash programme) in Badulla District

With Cabinet approval this urgent improvement implemented and completed 30th November 2013 to provide 2000 long outsiding new connections in the waiting list for the last eight years.

Procument plan

1. Intake improvement at Aluthwela, Diayathalawa, completed - De-Mal construction

2. Intake improvement at Ellathotta, Kahagolla and Rohamton, completed - CECB

3. Improvement at Banadarawela and Diyathalawa WTP, in progress - Isuru Engineering

4. Replacement of low lift pumps at Aluthwela intake, Diyathalawa, in progress - DIMO

5. Replacement of Booster pumps at Aluthwela, Diyathalawa, in progress - Lanka Tech

6. Enlarging of Aluthwela pumping main, in progress

Water Supply In Chronic Kidney Diseased (CKD) Areas

The Following CKD areas have been identified and arranged drinking Water Supply by using browsers for drinking and cooking purposes.

Short term proposal has been prepared for the cost of Rs. 81.4 million for Moneragala and Bandarawela Districts.

1. Girandurukotte - Theldeniya vasama Hangurankethyaya in Mahiyanganaya DS Division - 17 PE tanks located at identified places to supply drinking water for 95 families.

2. Kukurampola, Rahathangama and Kumaragama in Buttala DS Division - 18 PE tanks located at identified places to supply drinking water for 180 families.

3. Warunagama in Wellawaya DS Division - A proposal has been prepared to fix Iron and Floride removal Filters to improve Water quality.

  • In addition to the above areas Hambegamuwa in Moneragala District has also been identified to implement a Water Supply Project with the cost of Rs 1600 Million (Local Funding)
  • Redee maliyathe  in Mahiyanganaya DS Division in Badulla district has also been identified to supply pipe borne water supply from Mahiyanganaya WSP.
Project Name  DS Division

No of Families

Tentative Estimate (Rs Million) Allocation for 2014 (Rs Million)
Bogoda WSS Haliela 21 2.20 2.00
 Sinnamaliatenna WSS Bandarawela 200  20.00  4.00 
 Makulella WSS Bandarawela  840   63.00 4.00 
Galauda WSS  Kandeketiya  400  19.00  2.30 
Ketawela WSS  Haliela  425  36.00  3.80 
Pelgahatenna WSS  Passara  450  31.00  1.20 
Rehabilitation of Lunugala WSS Lunugala 830  44.30  5.80 
Rehabilitation of Udawela WSS  Badulla  1100  16.00  4.50 
Rahupola WSS  Uva Paranagama  270  40.30  4.50 
Rahangala WSS  Welimada  120  36.00  6.90 
Belaganwewa WSS  Mahiyanganaya  1100  58.00  14.00 
Rehabilitation of Nayabedda State WSS  Bandarawela  170  7.50  1.00 
Rathkinda WSS  Mahiyanganaya  850  90.00  5.50 
Eladaluwa WSS Badulla  320  47.00  5.70 
Rehabilitation of Koltenna WSS Bandarawela  170  10.00  1.00 
Improvement of Plantation Badulla    5.00  5.00 
Improvement of kandana WSS Haliela  120  3.00  1.70 
Rehabilitation of Bathalyaya WSS Mahiyanaganaya  1100  18.50   
Rehabilitation of Kandana WSS Haliela  120  3.00  1.70 
S/D of uPVC pipes & Specials Badulla   5.00 5.00
Sanitation Projects Badulla   5.00 1.00
Total  8606 548.80 78.90

Please click here to view / download full contact list for Regional Support Centre (Uva)

Postal Address :

Regional Support Centre (Uva)
National Water Supply & Drainage Board
1st Floor,Motor Service Station Building,

Badulla Road,

Bandarawela

Telephone
: +94 57 2222417
Fax
: +94 57 2223417
Name & Designation Telephone Fax Mobile E-mail
Eng.M.M.M.Nazeel
Deputy General Manager (Uva)
+94 57 2224417,
+94 57 2221417
+094 0772302762
+94 57 2223417  

This email address is being protected from spambots. You need JavaScript enabled to view it.,
This email address is being protected from spambots. You need JavaScript enabled to view it.,

 

Eng. K.P.Vinothan
Assistant General Manager (Uva)
+94 57 2232658 +94 57 2232658 +94 773179445 This email address is being protected from spambots. You need JavaScript enabled to view it.,
This email address is being protected from spambots. You need JavaScript enabled to view it.

Managers (Operational & Maintenance)

Name & Designation Region Telephone Fax Mobile E-mail Responsibility areas
Eng. T.M.M.D.Tennakon
(Manager- Bandarawela)

Bandarawela +94 57 2222417 +94 57 2231048 +94 71 4407145 This email address is being protected from spambots. You need JavaScript enabled to view it.">managerban
@waterboard.lk
This email address is being protected from spambots. You need JavaScript enabled to view it.">Diyathalawa, Bandarawela, Badulla, Boralanda, Divithotawela, Ambagasdowa, Mahiyanganaya, Giradurukotte, Welimada, Haputale, Keppitipola, Madowila, Bogahakumbura, Haldumulla, Seelathenna, Madawela, Silmiyapura, Hali -ela, Lunuwatta, Liyangahawela, Amunukella, Kandeketiya

Mr. W.M.N. Gunasekara

(Area Engineer - Bandarawela)

+94 716532860 

Mr.D.L.H. Vitharana

(Area Engineer - Badulla)

 +94 552222405 +94 552228140  +94 777706538 
Eng.
( Manager - Moneragala)

Monaragala +94 55 2277067 +94 55 2277158 +94 77 This email address is being protected from spambots. You need JavaScript enabled to view it.">managermon
@waterboard.lk
 Moneragala, Siyabalanduwa, Bibila, Okkampitiya, Sevanagala, Thanamalwila, Badalkumbura, Wellawaya, Buttala, Nakkala, Medagama

Ms. Chandani 

Bandara

(District Engineer)

+94 773904680

Chief Engineers

Name & Designation Telephone Fax Mobile
Eng. D.L. Ajith
(Chief Engineer - Construction)
+94 572224253 +94 572232658 +94 773502186

 Eng. K.H.C. Dayarathna
(Chief Engineer - M&E)

+94 57224417 +94 572224417   +94 773502183 

 Eng. M.I.M. Nazeer
(Chief Engineer - Planning & Design)

 +94 572222417 +94 572232658  +94 772240539 
Eng. A.H.Nimal
(Chief Engineer - Planning & Coordination)

 +94 572224417 +94 572223417   +94 718103385

 Eng. A.H.Nimal
(Chief Engineer - Sector Planning)

 +94 57224417 +94 572221417  +94 718103385 
 Mr. C.A.Kumarasena
(Chief Accountant)
+94 572224417  +94 572224417  +94 772443510 
 Mr.S.M.D. Premarathna
(Chief Sociologist)
+94 572224417   +94 572224417  +94 718179744
 Mr.J.M. Vijitha
(Manager - Commercial)
+94 572224417  +94 57224417  +94 718009880 
 Mr. Vithana
(Supply Officer)
+94 572224417 +94 572224417 +94 714438465
Mrs. Samitha Jayakody
(Personal Officer)
+94 572224417 +94 572224417 +94 714419965

Service Standard Indicators

Service Indicators  2012
Regional Average
Water Coverage (%) Pipe System maintained by NWSDB 16.2%
Per Capita Consumption (l/c/d) 94.0
Water Availability (hours) 9.6
Water Quality - Bacteriological Quality Compliance 94.1% 
Water Quality - Bacteriological Testing Compliance 100.0 %
Water Quality - All Samples Compliance 71.2% 
Sewerage Coverage (%) -

Operational Indicators

Operational Indicators 2012
Regional Average
Non-Revenue Water (%) 30.0%
Non-Revenue Water - m3/conn/day 0.23
Defective Meters per '000 connections 124.6
Total Staff/ 1000 connection 27.4
Operational Staff/ 1000 connection 25.4
Estimated Bills/ 1000 connections 186.4

Performance in Customer Service

Customer Service Indicators 2012
Regional Average
Response to requests for new service connections (%) 90.8%
Customer Complaints Volume (Complaints/ 1000 connection) 230.0
Customer Complaints Resolution 67.5%

Key Performance Indicators (KPIs)

Financial KPIs 2012
Regional Average
Collection Ratio (%) 97.4%
Accounts Receivable Period (months) 3.3
Collectable Accounts Receivable Period (months) 1.3
Operating Ratio 1.34
Production Cost (LKR/ m3 Produced) 24.42
Average Tariff (LKR/ m3 Sold) 18.68
Stock Efficiency (LKR/ connection) n/a


Targets 

  • Urgent improvements to Bandarawela and Diyathalawa Water Supply Schemes (6month crash programme) in Badulla District.
  • With Cabinet approval this urgent improvement implemented and completed 30 th November 2013 to provide2000 long outstanding new connections in the waiting list for the last eight years.

Procurement plan
• Intake improvement at Aluthwela,Diyathalawa, completed - De-Mal construction.
• Intake improvement at Ellathotta,Kahagolla and Rohamton, completed - CECB.
• Improvement at Bandarawela and Diyatalawa WTP , in progress– Isuru Engineering.
• Replacement of low lift pumps at Aluthwela intake, Diyatalawa, in progress – DIMO.
• Replacement of Booster pumps at Aluthwela, Diyatalawa, in progress – Lanka Tech.
• Enlarging of Aluthwela pumping main, in progress.

 

  • Water Supply in Chronic Kidney Diseased (CKD) Areas
  • The following CKD areas have been identified and arranged drinking Water Supply by using browsers for drinking and cooking purposes.
  • Short term proposal has been prepared for the cost of of Rs 81.4 Million for Moneragala and Bandarawela Districts.
  • Girandurukotte – Theldeniya vasama Hangurankethyaya in Mahiyanganaya DS Division - 17 PE tanks located at identified places to supply drinking water for 95 families.
  • Kukurampola, Rahathangama and Kumaragama in Buttala DS Division - 18 PE tanks located at identified places to supply drinking water for 180 families.
  • Warunagama in Wellawaya DS Division- A Proposal has been prepared to fix Iron and Floride removal Filters to Improve Water Quality
  • In addition to the above areas Hambegamuwa in Moneragala District has also been identified to implement a Water Supply Project with the cost of Rs 1600 Million (local funding)
  • Redee maliyathe in Mahiyanganaya DS Division in Badulla district has also been identified to supply pipe borne water supply from Mahiyanganaya WSP.

RWS Projects – Badulla

Project Name DS Division No of Families

Tentative Estimate
(Rs Million)

Allocation for 2014
(Rs Million)

Bogoda WSS Haliela 21 2.20  2.00
Sinnamaligatenna WSS Bandarawela 200   20.00 4.00 
Makulella WSS Bandarawela 840 63.00 4.00 
Galauda WSS
Kandeketiya  400 19.00 2.30 
Ketawela WSS Haliela  425 36.00 3.80 
Pelgahatenna WSS Passara 450 31.00 1.20 
Rehabilitation of Lunugala WSS Lunugala   830
44.30 5.80 
Rehabilitation of Udawela WSS Badulla  1100 16.00 4.50 
Rahupola WSS Uva paranagama 270 40.30 4.50 
Rahangala WSS Welimada 120 36.00 6.90 
Belaganwewa WSS Mahiyanganaya 1100 58.00 14.00
Rehabilitation of Nayabedda state WSS Bandarawela 170 7.50 1.00
Rathkinda WSS Mahiyanganaya 850 90.00 5.50
Eladaluwa WSS Badulla 320 47.00 5.70
Rehabilitation of Kolatenna WSS Bandarawela 170 10.00 1.00
Improvement of Plantation Badulla   5.00 5.00
Improvement of Kandana WSS Haliela 120 3.00 1.70
Rehabilitation of Bathalyaya WSS Mahiyanganaya 1100 18.50 -
Rehabilitation of Kandana WSS Haliela 120 3.00 1.70
S/D of uPVC pipes & Specials Badulla   5.00 5.00
Sanitation Project Badulla   5.00 1.00
Total 8606 548.80 78.90

 

RWS Projects – Moneragala

Project Name DS Division No of Families

Tentative Estimate
(Rs Million)

Allocation for 2014

No of Contract

Completed Design

Remarks

Kiriibbanwewa Left WSS  Sewenagala 650  42   20.00 9 6 Received from Uva PC
Buduruwagala Temple water supply scheme   Wellawaya  8 8.30  3.50  6 5  
Ruhunudanawwa extension   Siyambalanduwa  169 8.40  3.70  5 3  
Muthukandiya WSS   Siyabalanduwa 1597  333.0  35.00  15 5 10 million received Gamidiriya
Improvement of Okkampitiya WSS   Buttala  1000 38.40   5.00 8 3  
Gangodaarawa Kolladeniya WSS   Madulla  529  53.70 8.20  10 7  
Block 03 WSS   Wellawaya 250  5.40  2.50  1 1  
Dug well construction in Siyambalnaduwa area   Siyabalanduwa 496  3.10   2.40 1 1  
Supply low cost chlorinators to CBOs   Moneragala Dist   1.40  1.40  1 1  
Rehabilitation of Samagipura WSS   Sewanagala  650 5.00  1.90  1 0  
Rehabilitation of Kowl ara north WSS   Sewanagala  450 5.00    1 0  
Pallewela Govindupura WSS   Sewanagala 736  70.00  5.90  9 7  
Maligawila temple WSS   Buttala   3.60  0.50  3 1  
Extension of pipe lines to Kumaragama area   Buttala 539   160.00   5 3  
Extension of pipe lines to kumaragama area   Buttala 447  50.00    4 1  
Ground Water activities   M’gala/ Badulla   22.00  20.00       
S/D of DI Pipes & Special Moneragala   5.00 5.00 1 1  
S/D of uPVC Pipes & Special Moneragala   5.00 5.00 1 1  
Total   819.30  120.00  81 46  

 

Ongoing & proposed projects

Project Name Total Estimate (Rs.M) No of Beneficiary

Started Date

Expected Date of Completion

Ohiya Transmission

264.73 10,000 Feb-1999 Commissioned on 25.02.2013

Ohiya Distribution improvement

Mar-2013 June-2015
Moneragala WS Stage II 154.8 10,000 Jun-1999 April - 2015
Badalkumbura WS 124.4 22,000 Oct-1999 Dec-2013
Ambagasdowa Distribution improvement 382.0 17750 Jun-1999 Nov-2013
Jun-2013 Nov-2014

Wellawaya WS

Wellawaya Distribution improvement

250.0 6000
Jan-2007 Commissioned on 25.07.2012
Aug-2012 April-2015

 

Projects Approved By Board of Directors and Projects in Pipeline

Project Name District

Estimated
(Rs M)

Board Approval Obtained

NPD Approval Obtained

Cabinet Approval Obtained

Awarded Financial Agency Remarks

Badulla-Haliela Intergrated W.S.S

Badulla

11800

USA Funds On going
Mahiyanganaya Badulla 2743
Austrian Funds On going
Kandeketiya Badulla 750
    Expected is awarded by Nov 2014
Taldena/Galauda Badulla 988            
Badalkumbura, Alpotha integrated wsp Moneragala 2748       Local funding  
KiriIbbenwewa Moneragala 2708       Local funding Negotiation stage
Bibile - Medagama Under Feasibility Study

   
Buttala -Moneragala, madulla integrated wsp Moneragala 4340.38 Belgium funds

Design Approval is progress

Hambegamuwa wsp Moneragala 1614.38          
Atampitiya wsp Badulla 900          
Gowerammana / Keppetipola Badulla Under Feasibility Study    
Haldumulla / Seelathenne Badulla Under Feasibility Study    
Rural Water Supply Project Badulla & Moneragala 1050   Capital budget

On going

 

Water Coverage Details – Scheme wise

Badulla as at April 2016

No

Name of the Scheme

Number of New connections in April 2016

Total Number of connection

Design Capacity

(m3 /day)

1

Amunukale

0

389

90

2

Badulla

21

15,472

9000

3

Bandarawela

29

4,728

3000

4

Bogahakumbura/Madovita

3

1,186

110

5

Boralanda / Divithotawela

4

5,095

225

6

Diyathalawa

14

4,288

380

7

Haldumulla

2

288

110

8

Kandaketiya

0

69

45

9

Keppetipola

11

3,649

450

10

Liyangahawela

0

95

454

11

Lunuwatta

16

493

90

12

Mahiyanganaya

8

2,240

2000

13

Seelathanna

0

179

90

14

Silmiyapura

1

296

45

15

Welimada

0

678

1800

16

Medawela

4

1,216

90

17

Girandurukotte

1

777

2000

18

Haputale

4

808

135

19

Ambagasdowa

80

2,745

3000

20

Haliela

6

1,720

465

 

Moneragala as at March 2016

No

Name of the Scheme

Number of New connections in March 2016

Total Number of connection

Design Capacity

(m3 /day)

1

Buttala

27

4,755

3000

2

Moneragala

12

4,499

3000

3

Thanamalwila

10

1,262

600

4

Medagama

21

2,619

1200

5

Wellawaya

5

10,833

8000

6

Badalkumbura

21

1,749

800

7

Sewanagala

6

2,301

2000

8

Bible

5

2,188

1200

9

Nakkala

0

1,159

800

10

Siyabalanduwa

15

1,119

800

11

Okkampitiya

4

2,610

1200

 

 